Metal Section:
Close End 50000 pcs per/day
Open End 10000 pcs per/day Per Month: 60000 pcs x 28=15,60000 pcs.
Nylon Section:
Close End 20000 pcs per/day
Open End 10000 pcs per/day
Per Month: 30000 pcs x 28 -7,80000 pcs.
Plastic Section:
Close End 15000 pos per/day
Open End 15000 pcs per/day
Per Month: 30000 pcs x 26 780000 pos.
Sewing Thread Section:
Coning-18 sets so 216 cones per 25 minutes.
(Bhr 480 min) and 216 cone/25 min 8.04 cone per min
So (480×8,04)4147 cones+ (180×3.04) 1555 cones
Total: 5702 x 28-148252 cones per month
If Necessary then two shifts so
4147 cones x 2 8294 cones x 25 215044 cones per month.
Elastic Section:
24000 Yd’s Per Day or 500 Roll Per Day
24000 Yd’s x26-024000 Yds/ 13000 Roll per month
Dyeing Section:
Sewing Threads 500 kg per shift
Zipper 500 kg per shift Twill
Tape:
15000-20000 yd per day
15000/20000 ydx25-39000-520000 yd’s per month
Draw Cord and Drawstring:
1000 yd per day 20×1000 yd-200000 yards per month